First of all, after the arrival of the feed machinery crusher, we need to line a full range of inspection, especially pay attention to its various coupling components in the process of transportation whether the phenomenon of loosening. Of course, the crusher in the factory have done a careful installation check and calibration. In the installation, be sure to find the leveling, fixed foot bolts, to ensure that the crusher is firmly fixed in the foundation. The pulverizer installation is separated separately or installed in the basement to provide sound insulation.
In addition, when installing feed machinery, special attention should be paid to the installation of the feeder and discharge system. Usually the feeder selection should be the same as the width of the inlet of the mill to ensure uniform distribution of materials into the mill. The feed machinery discharge system should ensure that each connection section and the wind shutter to be airtight, minimize the number of elbows in the pipeline installation, the direction of the duct and the way out of the wind to be installed correctly, etc.

