Please fill the gear oil before starting the feed pellet machine, and tighten the plug of the oil filling hole after refueling. Carefully check the pellet machine power line, prevent the affected point, leakage, to ensure the safety of electricity. Carefully check the machine motor, pellet mill transmission parts connecting parts of the bolts, screws are solid, there is no loose phenomenon, in order to tighten in time. After starting the machine, first idling for 1 minute, check whether the machine rotation is normal and then a small amount of feed, to be the residual material in the machine out of the net, and then can be evenly feeding.
Before feeding, please pay attention to the hard debris in the raw materials, and prevent stones, iron and so on from entering the bin to avoid damage to the machine. Pellet machine every 8 hours of operation must be for the universal joints on the oil injection air refueling once, an injection of 2-3 drops of oil can be. Before stopping the machine, please put on a little wet material or oil, so that the next day after the start of the smooth discharge of material.

