                    During the transportation process of the biomass briquetting machine, operations such as grass grabbers, straw stacking, scrapers, belt conveyors, and truck loading will generate a large amount of dust. Water spraying and closed ventilation can be used to prevent dust emissions. When processing raw materials such as straw, biomass briquetting machines are the best choice for producing new energy. Depending on the type, size and specification of the raw materials to be processed and the properties of the raw materials, the types of supporting equipment required vary.

 

ring mold briquette press

Model

Power

Capacity

Briquette size

Hole quantity

MK-550

55kw

1t/h-1.5t/h

32*32mm

36pcs

MK-750

75kw

1.5t/h-2t/h

32*32mm

54pcs

MK-900

90kw

2t/h-2.5t/h

32*32mm

72pcs

MK-1600

160kw

2.5t/h-3t/h

32*32mm

120pcs

 


Installation method of biomass briquetting machine:
1. According to the location of the biomass briquetting machine, place the main machine, distribution board, and conveyor in the appropriate position, and carefully check whether the bolts and screws connecting the mechanical motor and transmission components are firm and loose, otherwise they should be tightened immediately.
2. Connect the power cord between the host and the power distribution cabinet: six diameter copper core cables ≥ The host motor and the terminal blocks of the power distribution cabinet are connected in order of 16mm. The wiring of the two contactors should be in the same order as the motor terminals.
3. Connect the power cord between the host accessories and the power distribution cabinet: connect the temperature control wire contacts to the host junction box: connect the water pump power cord to the host junction box.
4. Connect the power cord between the feed conveyor and the power distribution cabinet: three copper core cables with a wire diameter of ≥ 1.5mm2 should be used between the feed conveyor and the power distribution cabinet. Connect the feed conveyor motor to the power distribution cabinet. The lower end of the cabinet is marked with the terminal block connection for "feeder conveyor".
5. The power cord connection method between the finished product conveyor and the power distribution cabinet is the same as above;
6. Check the power cord carefully to prevent power string and leakage to ensure the safety of electricity use.